Design and Construction Management
Section
Central
Arkansas Water
P. O. Box 1789 / 221 East Capitol Avenue
Little Rock, AR 72203
The
Design and Construction Management Section designs and inspects
water mains installed by a Contractor or Central Arkansas Water
distribution forces. These projects may be generated by other governmental
agencies or as part of a routine main replacement schedule.
All
water main installations must comply with Central Arkansas Water
(CAW) Standard Pipeline Materials and Construction Specifications.
Prior to facilities being accepted into the water distribution system,
samples must be collected and analyzed by CAW's laboratory to ensure
that the water is safe for consumption.
For more information
concerning water main installation projects, please contact:
Zone 1
| Joe O'Hara |
Engineer |
501-377-1338 |
| Chris Green |
Engineering Technician |
501-377-1353 |
Zone 3E2
| Joe O'Hara |
Engineer |
501-377-1338 |
| John Jones |
Engineering Technician |
501-377-1337 |
Zone 2
| Blake Weindorf |
Senior Engineer |
501-223-1579 |
| Billy Otts |
Engineering Technician |
501-223-1565 |
Zone 3E1
| Blake Weindorf |
Senior Engineer |
501-223-1579 |
| Robert Freeman |
Engineering Technician |
501-223-1857 |
Zone 4E1
| Tom Wray |
Senior Engineer |
501-377-1221 |
| Mark Ragland |
Engineering Technician |
501-377-1241 |
Zone 4E2
| Tom Wray |
Senior Engineer |
501-377-1221 |
| Steve Overstreet |
Engineering Technician |
501-377-1236 |
Various Zones
| Tom Wray |
Senior Engineer |
501-377-1221 |
| James Dunn |
Engineering Technician |
501-377-1235 |
Top
|