Search Our Site

 

 

 

 

Design and Construction Management Section

Central Arkansas Water
P. O. Box 1789 / 221 East Capitol Avenue
Little Rock, AR 72203

The Design and Construction Management Section designs and inspects water mains installed by a Contractor or Central Arkansas Water distribution forces. These projects may be generated by other governmental agencies or as part of a routine main replacement schedule.

All water main installations must comply with Central Arkansas Water (CAW) Standard Pipeline Materials and Construction Specifications. Prior to facilities being accepted into the water distribution system, samples must be collected and analyzed by CAW's laboratory to ensure that the water is safe for consumption.

For more information concerning water main installation projects, please contact:

Zone 1

Joe O'Hara Engineer 501-377-1338
Chris Green Engineering Technician 501-377-1353

Zone 3E2

Joe O'Hara Engineer 501-377-1338
John Jones Engineering Technician 501-377-1337

Zone 2

Blake Weindorf Senior Engineer 501-223-1579
Billy Otts Engineering Technician 501-223-1565

Zone 3E1

Blake Weindorf Senior Engineer 501-223-1579
Robert Freeman Engineering Technician 501-223-1857

Zone 4E1

Tom Wray Senior Engineer 501-377-1221
Mark Ragland Engineering Technician 501-377-1241

Zone 4E2

Tom Wray Senior Engineer 501-377-1221
Steve Overstreet Engineering Technician 501-377-1236

Various Zones

Tom Wray Senior Engineer 501-377-1221
James Dunn Engineering Technician 501-377-1235

 

Top